The attractiveness of Medium Scale Wind Solutions in the UK has increased dramatically with the Feed-In Tariff scheme (FiT) in Great Britain and increased ROCs in Northern Ireland.
Landowners and businesses are now eligible for a generous generation tariff per kWh as well as an export tariff under the FiT in Great Britain, and a quadrupling of the ROCs up to 250kW in Northern Ireland. They can also benefit from using energy on-site thus displacing bought-in energy costs.
-
Initial Site Assessment
-
Grid Feasibility Study
-
Planning Permission for Turbine
-
Wind Measurement Campaign
-
Grid Network Connection and Capacity Study
-
Build Grid Connection
-
Acquire Wind Turbine
-
Site Preparation
-
Balance of Plant
-
Turbine Installation
-
Site Commissioning
-
Lifetime System Maintenance
|