The DNO requires the generating unit to comply with Engineering Recommendation G59/2/ the DNO. Once the assessment and design study has been carried out, and a grid connection has been applied for, NIE will carry out all works related to implementing the grid connection. DNO will also seek statutory permission for the connection, and landowner permissions for equipment, etc.
The project promoter may also wish Obelisk to cross-check that the connection terminates on-site according to the detailed site plans so that the turbine & balance of plant can feed into the connection without difficulty.
|